Every job starts with a site survey.
Three terracotta pots of herbs on the white sill of a double-hung window, brick houses across the street soft beyond the glass.

How it works

Three business days to cancel, counted on a calendar

Sundays and nine holidays don't count, Saturdays do, and nothing is ordered, filed or started until the days are over.

  • Business days, not working days
  • In writing, before midnight

AI-generated illustration. Not a real home or business.

When the days start, and where they apply

You can cancel the contract until midnight of the third business day after the day you sign it, wherever you sign it, owing nothing: tell us in writing before that midnight, by letter to the office or by e-mail; a letter counts on the day it is mailed. Nothing is ordered, nothing is filed in your name and no work is done until then.

The clock starts at your signature. A sizing range, an enquiry or a survey is not a contract, and binds you to nothing that would need cancelling.

The office places no order and files no drawing inside the days, so changing your mind never leaves a panel bought for your roof or a permit in your name to be unpicked.

A holiday weekend, counted day by day

A worked example: a contract signed on Friday, July 2, 2027. The household is invented; the count is the engine's own.

For cancelling, a business day is every day except Sunday and nine holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas Day. That count is the law's, and it is not the same as the days the crews work.

A holiday that falls on a Saturday is kept on the Friday before it as well, and one that falls on a Sunday on the Monday after, and neither of those days counts toward the three, so the count is never shorter for you.

  • Friday, July 2, 2027

    You sign. The day of signing is not one of the days: the count starts the day after it.

  • Saturday, July 3, 2027

    The first business day. A Saturday counts for cancelling, though no crew works on one.

  • Sunday, July 4, 2027

    A Sunday, and the date of one of the nine holidays too. Not counted.

  • Monday, July 5, 2027

    The day the holiday on Sunday, July 4 is observed. Not counted: the date and the observed day both come out of the count, which only ever makes your time to cancel longer.

  • Tuesday, July 6, 2027

    The second business day.

  • Wednesday, July 7, 2027

    The third business day. You can cancel until midnight tonight, owing nothing.

  • Thursday, July 8, 2027

    The first working day after the three: the earliest day anything under the contract is started, an order placed or a drawing filed in your name.

Across this weekend the three business days stretch to five calendar days: the window opens after Friday, July 2 and closes at midnight on Wednesday, July 7.

Nothing is started before Thursday, July 8, 2027. The install itself comes weeks after that, once the drawings are filed and the permits issued.

Business days and working days

One count is the law's, for cancelling; the other is the crews', for working.

The cancelling count runs through Saturdays and stops only for Sundays and nine holidays. The crews keep a shorter week, Monday to Friday, and stop for more holidays than that. Anything under the contract starts on the crews' calendar, and only once the law's count has run out.

No survey or install is done on a weekend or on a federal holiday: New Year's Day, Martin Luther King Jr. Day, Washington's Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving or Christmas Day, or the day any of them is observed.

Signed at your kitchen table

A contract signed at your kitchen table after a survey is also a home solicitation sale under New York's door-to-door law: the contract says so in bold beside your signature, and you get two copies of a notice of cancellation to send back if you change your mind.

Cancelling, in practice

A short note does it: your name, the address of the house, the date on the contract, and a sentence saying you are cancelling it. If you mail it, a receipt from the post office records the day it went; if you e-mail it, keep the sent copy.

No reason is needed and none is asked for. Because nothing was ordered, filed or paid inside the days, cancelling leaves nothing behind to settle.

After the three days, a contract can still be changed or ended by agreement; a change is written down and signed as a change order before the work it changes is done.

Before the contract

An enquiry and a survey come first, and neither binds you.

Sending the planner's range to us is an enquiry, not a booking. It holds no date and commits you to nothing. We call or e-mail by the end of the next day the office is open, to arrange the survey.

Size your roof

Try the roof sizing planner: panels, kilowatts and the roof they take at the published rate, in about three minutes. Sending it to us books nothing.