Net metering and permission to operate, as of October 2026

As of October 2026: how the utility credits what a system sends to the grid, the charge for the system's size that changes every year, network areas, and why panels switch off in an outage.

  • Four-minute read

AI-generated illustration. Not a real home or business.

Two directions through one meter

A system tied to the grid has no store of its own. When the panels make more than the house is using at that moment, the rest goes out through the meter to the grid; at night, and on a dark winter afternoon, the house draws from the grid as it always did. What happens to what goes out is the part with a date on it:

As of October 2026, Con Edison customers who add solar are credited for what they send to the grid under net metering, and pay a monthly charge for the system's size, the Customer Benefit Contribution, that changes every year. The installer applies to the utility in your name, and the system runs only after the utility gives permission to operate.

Two things in that sentence matter to anybody reading a solar site. The charge in it changes every year, which is one reason no figure for it, or for what a system would do to a bill, is printed anywhere here. And the system does not run until the utility says it may.

The meter is part of the change. It now has to count in both directions, and setting it to do that is the utility's own work, done in the last of the steps below.

Permission to operate

The end of an install day is not the end of the job. The last thing the crew does is connect the system to the house and leave it switched off, and the two steps after that belong to other people:

  1. The tie-in

    A short power cut at the end of the day, while the system is connected to the house's panel. The system stays off.

  2. Inspections

    An independent inspector and the Department of Buildings' electrical inspector check the work, usually in the weeks after.

  3. Permission to operate

    The utility reviews the job and changes the meter's settings. Only then is the system switched on and the monitoring set up, and only then does the last stage fall due.

Until the last of them, the switch stays off, however sunny the week. Callum Okonkwo-Breen books the surveys and keeps the paperwork moving. He calls you the day the utility's permission arrives, and not before. The whole run from a signed contract to that call takes a while, and most of it is paperwork:

From a signed contract to a system the utility lets you switch on usually takes two to four months in New York City: the drawings and the permits, the install itself in a day or two, the inspections, and the utility's own review. A landmark review or a fire department variance adds weeks.

From the day the switch goes on, the system reports what it is doing:

Each system is set up with the inverter maker's monitoring, which shows you what the panels are doing on your own phone or computer. You can give the office the same view, and the contract says what the office does when a panel or an inverter stops reporting.

More than one meter

A house with more than one home in it raises a question a one-family house never does, and it is settled before anything is drawn, because it is far easier to settle then than to change later:

A house of two to four homes usually has a meter for each home, and the system is connected to one of them. Which meter it feeds is decided at the survey, with the owner, who signs for the whole roof.

However many households live under the roof, the contract and the utility's papers are the owner's to sign.Solar on a two- to four-family house goes through the rest of it: one roof, several homes, and a decision about the meters.

Network areas

Where the house sits on the grid matters as well, and it is something nobody can see from the street:

In parts of the city served by underground network cables, the utility may limit or refuse a connection. The utility answers that after the application, not before.

No installer can promise that answer before the application goes in. What an honest one can say is that the question exists, and that you will hear the answer as soon as the office does.

The largest home system

There is also a ceiling on the size of a home system, and the planner keeps under it:

As of October 2026, a home system in New York is net metered up to 25 kW, and the planner never sizes one larger.

When the grid goes down

A system tied to the grid shuts itself off when the grid goes down, so that nobody repairing the lines is hurt. Without a battery, panels do not keep the lights on in an outage, and this company does not install batteries.

This surprises people, and the reason is the part to remember. A line crew working on a street with the power off has to be able to trust that the wires are dead, so the inverters watch the grid, and when it disappears they stop sending anything into it. That is true of every system tied to the grid, whoever installed it.

The only thing that could carry a house through a power cut is a battery, and in this city that is a separate job with its own rules:

We don't install batteries. A home battery in New York City needs its own Buildings filing, a product the Fire Department has approved, and a holder of the Fire Department's own certificate to look after it, and very few products have that approval yet.

Size your roof

Try the roof sizing planner: panels, kilowatts and the roof they take at the published rate, in about three minutes. Sending it to us books nothing.