How it works
A sizing range, a survey, then a written contract
Three different things, in the order you meet them: what the planner prints from your answers, what the survey finds on your roof and in your basement, and the contract that carries the price.
AI-generated illustration. Not a real home or business.
First
The sizing range
The roof sizing planner turns your answers into a number of panels, the kilowatts they add up to and the roof they need, and works out the money from the published price per watt. Both ends of the range are printed the same size, because either can happen.
It sizes a system the way an installer starts a design: from a year of your electricity use and a typical figure for what a panel makes on a Queens roof of that kind, then cut to what your roof can hold once the fire code's clear paths are kept. The smaller of the two sets each end of the range. What a real system would make is worked out in the contract, with the shading measured, and guaranteed there.
It answers the first two questions anyone asks an installer, roughly how many panels and roughly how much, before anybody has been up on the roof. That is all it is for, and it says so.
A sizing range is not an estimate, a quote or a proposal, and nothing on this site is an offer. It is the number of panels your answers suggest, the roof they would take and their price at the published rate per watt, before any incentive. It says nothing about what a system would make or save. The system is designed after a survey of your roof and your electrical panel, priced in a written contract, and you can cancel that contract until midnight of the third business day after you sign it.
The three mounts, and the roof a panel takes on each
On rails and under a canopy a panel takes its own footprint of roof. On low frames it takes more, because the rows stand apart so that one row does not shade the next, and the gap behind each row is roof that carries nothing. That gap is one reason a canopy can hold more panels on the same flat roof.
| The mount | The roof | The rate per watt | Roof one panel takes |
|---|---|---|---|
| Low tilted frames on the roof itself | A flat roof | $5.20 | 28 square feet |
| A raised canopy over the roof, high enough to walk under | A flat roof | $6.40 | 21 square feet |
| Rails fixed to the roof | A sloped roof | $4.60 | 21 square feet |
Then
The survey
Every job starts with a site survey: on the roof we measure it, the parapet, the bulkhead or hatch and everything that stands on it, check the covering and the shade, and in the basement we look at the electrical panel and the meter. It takes about an hour up there and a little longer with you. A survey costs nothing, and you don't have to sign anything after it.
The survey is where a range turns into a layout. It sees what answers leave out: the vent stack in the middle of the sunniest stretch of roof, the tree two yards over, a soft patch by the drain, the fuse box behind the boiler.
What moves a range
The same few things move a sizing range at the survey, and a careful answer settles most of them in advance.
What moves a range at the survey: the bulkhead, the hatch, skylights, vents and chimneys measured where they really are, the parapet's height, shade from a tree or a building next door, the roof's own condition, and a year of your actual use instead of a band.
The bulkhead, the hatch and everything else on the roof
Answers describe a roof by its size. The survey finds where the bulkhead or the hatch, the skylights, the vent stacks and the chimney really stand, and each of them is something the panels have to go around.
The parapet
A tall parapet throws a shadow across the first row of frames when the sun is low, and the frames move back from it. A low one hardly matters.
Shade nobody mentioned
A street tree in full leaf, a taller building across the yard, a neighbor's bulkhead. The survey looks at where the shade falls and for how much of the day.
The roof's own condition
Blisters, open seams, a soft patch by the drain, water standing after rain. A covering near the end of its life is a roofer's job before it is anybody's roof for panels.
A year of real use
A band is a guess at a typical month. A year of bills shows the summer air conditioning and the winter months together, and the range moves to match.
After the survey
The written contract
After the survey you get a written contract: the system's size, the make and model of the panels and the inverters, the layout, the price itemized, the dates we expect to start and finish, the payment stages, what the system is expected to make with the losses worked out, the production guarantee, the makers' warranties, and who is responsible for the roof where it is fixed. New York names solar energy systems in its home improvement law, so a job over five hundred dollars needs one in writing, signed by both of us, with a copy for you before any work is done.
The contract is priced at the same published rate per watt as the range. What has changed is that somebody has measured the roof, so the watts are the watts of a layout rather than of a band of answers.
- N.Y. General Business Law § 771(1) (opens the source in a new tab) A home improvement contract is in writing, signed by both, and states the work, the materials, the price, the approximate start and completion dates, the payment schedule, the mechanic's lien notice and the insurer covering the work.
- N.Y. General Business Law § 770 (opens the source in a new tab) Home improvement includes roofing and solar energy systems, and a home improvement contract is one whose price is more than five hundred dollars.
What no page here says
No page on this site says what a system would save, what your bill would be, what a system would make or how soon it would pay for itself. Those depend on the utility's future prices, its yearly charges, your household's use and your own taxes, which nobody selling panels controls, and New York's rules require any savings figure an installer shows to sit beside a forecast built the State's way, from the past three years of your utility's real prices.
- UBP-DERS § 3B(C) (opens the source in a new tab) Marketing that includes savings estimates also includes, with similar prominence, a forecast built on a three-year average of the customer's utility's actual historical rates.
The other rules this page refers to
Each is linked to its source, with what it says in plain words.
- 6 RCNY § 5-12 (opens the source in a new tab) When a range of prices is stated, the highest is printed at least as large as the lowest.
- N.Y.C. Administrative Code § 20-395 (opens the source in a new tab) A home improvement contractor discloses that a written estimate is available, and any fee for one is disclosed before it is made.
Size your roof
Try the roof sizing planner: panels, kilowatts and the roof they take at the published rate, in about three minutes. Sending it to us books nothing.