Every job starts with a site survey.
Standing on a flat brick row-house roof: a long row of black solar panels on low tilted frames runs along the right side, a bare walkway of gray roof membrane beside it, a brick stair bulkhead with a gray steel door at the left, street trees and low brick apartment buildings under a pale morning sky.

37-32 61st Street, Woodside, Queens

Rooftop solar for Queens row houses and frame houses, sized in the open

Low tilted frames and raised canopies on the flat roofs of brick row houses, and rails on the shingle roofs of frame houses, for houses of one to four homes across Queens. Every roof is surveyed before anything is priced, and the drawings and the filings are put together in an office on 61st Street in Woodside.

  • Every job starts with a site survey.
  • A demonstration site — this solar company, its people and its customers are not real.

AI-generated illustration. Not a real home or business.

$4.60
a watt on rails, on a sloped roof; no sales tax
$5.20
a watt on low tilted frames, on a flat roof; no sales tax
$6.40
a watt under a raised canopy, over a flat roof; no sales tax
3
business days to cancel a signed contract, before anything is ordered or filed in your name

What we do

A solar company that shows its working

Copewick Solar puts panels on the roofs of Queens houses of one to four homes, and does in the open the things most installers keep for the sales visit. Each of them has a page that says how.

A planner that shows its working

The roof sizing planner turns your answers into a number of panels, the kilowatts they add up to and the roof they need, and works out the money from the published price per watt. Both ends of the range are printed the same size, because either can happen.

Open the roof sizing planner

One price per watt, on every day

No weekend price, no end-of-season price and no price for signing today: one published rate per watt for each mount, on every day.

The rates and what they cover

Surveyed, then written down

A survey on the roof and in the basement before anything is priced, a written contract after it, and three business days to cancel before anything is ordered or filed.

What the contract says

The roof done properly

The fire code's clear paths drawn first, every attachment fixed into a rafter and flashed, the load worked out by the engineer or architect who files the job, and a covering near the end of its life replaced by a roofer before the panels go on.

The fire code's paths

Plain about what it won't plan

Landmarks, slate and tile, roofs that face north or sit in shade, narrow flat roofs, batteries and buildings of five homes or more: the planner says so as soon as an answer reaches one.

Work we don't take on

The paperwork explained

Who files the building job, who files the electrical permit and why it has to come first, who requests the work permit, and why the system stays off until the utility gives its permission.

Permits and paperwork

Incentives, with a date on them

As of October 2026, the incentives that remain are listed with their own rules and the agency that decides, and none of them is worked out or given an amount here.

What incentives remain

No credential it does not hold

The company is invented, so it shows no license number, no registration, no insurance and no reviews, and each page that says so tells you what a real installer has to show you instead.

The license line

Systems

On the roof: frames, canopies and rails

Priced by the watt, at a rate printed on the site.

A flat row-house roof is never as empty as it looks from the hatch. The bulkhead, the vent stacks, a skylight, the chimney and the parapet all take room, and the fire code's walkway runs from the front of the house to the back. Low frames are set out around all of it, tilted toward the sky and standing apart, because each row throws a shadow behind it when the sun is low and a panel in shadow makes very little.

A canopy answers the walkway another way: it lifts the panels on posts high enough to walk under, so the path stays clear beneath the panels instead of beside them. That is why it can carry more of a narrow roof, and why its rate per watt is higher. It is a structure in its own right, with its own drawings and its own feet on the roof.

On the shingle roof of a frame house the rails are fixed through the roof into the rafters, never only into the deck: the deck is boards or plywood, and a rafter is what holds when the wind gets under a panel. Saoirse Lindgren-Oyelaran fixes the attachments to the rafters and seals every one of them. She finds the rafter before she drills, every time. She seals each attachment under a metal flashing before the rail goes on. The flashing sheds water around the bolt the way the shingle above it does.

The fire code's paths

How a job goes, in six steps

Sized here, surveyed on your roof, written down and signed, and then three business days before anything is ordered. Nothing on this website books a survey or a crew.

  1. Size it

    The roof sizing planner turns your roof and your bill into a number of panels, the kilowatts and the roof they need, at the published rate. It takes about three minutes.

  2. Send it, if you like

    Sending the planner's range to us is an enquiry, not a booking. It holds no date and commits you to nothing. We call or e-mail by the end of the next day the office is open, to arrange the survey.

  3. The survey

    On the roof and in the basement, about an hour: the roof measured, the covering and the shade checked, the electrical panel and the meter looked at. It costs nothing, and nothing has to be signed after it.

  4. A written contract

    The system, the equipment by make and model, the layout, the price itemized, the dates, the payment stages, what it is expected to make and the production guarantee, with the State's disclosure form.

  5. Three business days

    You can cancel until midnight of the third business day after signing. Nothing is ordered or filed before then.

  6. Permits, install, permission

    From a signed contract to a system the utility lets you switch on usually takes two to four months in New York City: the drawings and the permits, the install itself in a day or two, the inspections, and the utility's own review. A landmark review or a fire department variance adds weeks.

A worked example

What the planner prints, and how to read it

This is the roof sizing planner's answer for a 1930s brick row house in Woodside: a row house about twenty feet wide and forty deep, a flat roof, and a household using 500 to 700 kWh a month. It comes to 11 to 16 panels on low tilted frames, 4.8 kW to 7.0 kW, taking 308 to 448 square feet of the roof.

Each end of the range is the smaller of two counts: the panels the use calls for, and the panels the roof holds once its clear paths are kept. Here the low end is set by the household's use and the high end by the use and the roof alike. On a narrower roof, or under a bigger household, the roof takes over.

The money is the watts times the published rate for frames, before any incentive and with no sales tax. Both ends are printed the same size because either can happen, and neither says what the system would make: that is worked out after a survey and written into the contract.

The line under the figures is there because the house is older: an asbestos investigation is a step on the way to the Buildings filing, not a reason to stop.

A worked example: a sizing range

A row house with low frames A 1930s brick row house in Woodside

The thirteen answers behind it
Where is the house?
Woodside or a neighborhood next to it
Do you own the house?
Yes, I own it, alone or with someone
What kind of house is it?
An attached or semi-detached row house, one home
When was it built?
Before 1987
Is the house a landmark, or in a historic district?
No
What is the roof like?
Flat or nearly flat, behind a low wall, with a rolled roof: rubber, modified bitumen, a white membrane or tar
How old is the roof's covering?
Ten to fifteen years old
How much shade falls on the roof in the middle of the day?
Open sky most of the day
How big is the roof?
A row house about twenty feet wide and forty deep
On a flat roof, how would you like the panels mounted?
Low tilted frames on the roof itself
What is in the electrical box in the basement?
A panel of circuit breakers
How would you like to give your electricity use?
In kilowatt-hours (kWh), from the usage line
About how many kilowatt-hours a month?
500 to 700 kWh a month
  • Panels440 watts each11 to 16 panels
  • System sizethe panels' watts added up4.8 kW to 7.0 kW
  • Roof they take28 square feet a panel on this mount308 to 448 square feet
  • Mounted ona flat roofLow tilted frames on the roof itself
  • The ratethe same for every customer on every day$5.20 a watt
  • The range, before any incentivea system's price is its watts times the rate, and each panel the company fits is 440 watts$25,168.00 to $36,608.00
  • No sales tax: a home solar system is exempt in New York City.
  • The use it is sized fromin kilowatt-hours (kWh), from the usage line500 to 700 kWh a month
  • For a house built before 1987, or one whose age nobody knows, the owner has an asbestos investigation made before the Buildings filing, because old roofing and the materials around it can contain asbestos. It is a step on the way, not a reason to stop.

The roof sizing planner's answer to these questions, at the published rate per watt. A sizing range is not an estimate, a quote or a proposal, and nothing on this site is an offer.

Rates

One rate per watt for each mount

The price is per watt of panels, by how they are mounted: $4.60 a watt on rails on a sloped roof, $5.20 a watt on low tilted frames on a flat roof, and $6.40 a watt under a raised canopy over a flat roof. It is the same for every customer on every day. No sales tax: a home solar system is exempt in New York City.

What changes from one house to the next is the watts: how much roof is left once the paths are kept, how much electricity the household uses, and which way of mounting the roof allows. Two houses on the same block with the same roof and the same mount are priced at the same rate.

The rates, what they cover, and the worked examples

Survey, paperwork and service

The survey, the paperwork, and after

From the survey to the utility's permission.

Esme Matsuda-Hale draws the first panel layouts and puts the filings together. She draws the clear paths first and the panels second. The order is not a habit: the paths are where firefighters walk, so they are fixed first and the panels fill what is left. A layout that starts from the panels and fits the paths in afterwards is how a roof ends up planned for panels it cannot carry.

Callum Okonkwo-Breen books the surveys and keeps the paperwork moving. He calls you the day the utility's permission arrives, and not before. A system can be finished on the roof weeks before it may run. The inspections come first, then the utility's own review, and until the utility says yes the system stays switched off.

Incentives

Incentives, with the date they were read

Incentives As of October 2026

  • As of October 2026, the federal residential clean energy credit no longer applies to a home solar system: it ended for systems whose installation was completed after December 31, 2025, even where some of the price was paid earlier.
  • As of October 2026, New York State offers an income-tax credit for solar equipment at your main home, with its own limits; a bill to change it has not been passed.
  • As of October 2026, New York City offers a property-tax abatement for a solar system placed in service before 2035. The owner applies, inside the Buildings filing, by March 15 before the tax year it starts in.
  • As of October 2026, NYSERDA's standard incentive for homes in Con Edison's area has closed; an incentive for households that qualify by income remains, and NYSERDA decides who qualifies.

Incentives exist and change. Each has its own rules and limits, and what one is worth depends on your own taxes. This site does not work any of them out: check with the IRS, the State's Department of Taxation and Finance, the City's Department of Buildings, NYSERDA and your tax adviser before you rely on one.

What incentives remain, and why none is worked out here

The team

Six people, described by what they do

Six people run this company: an owner who does the site surveys, an office coordinator, a layout and paperwork lead, an install crew lead, a lead for the roof attachments, and a canopy crew lead. None of them is described here by a license, a certification, a course or years in the trade: the law says what a real installer must hold, and these pages say what each of these people does. None of them is an electrician, an engineer or an architect.

A pair of worn tan work gloves on the stone coping at the corner of a brick parapet, treetops and sky beyond.AI-generated illustration. Not a real home or business.

Noemi Castellano-Reyes

Owner, site surveys

Runs the company and does most of the site surveys.

Noemi measures every roof herself, from the parapet in, because a drawing is only as good as the tape.

Noemi sits down with you after the survey and goes through the layout before anything is written up.

The picture is a still of the tools, not a portrait.

A closed canvas tool bag on a gray roof membrane against a brick parapet with a stone coping.AI-generated illustration. Not a real home or business.

Ruairi Delacroix-Amadi

Install crew lead

Leads the crews on flat and sloped roofs across Queens.

Ruairi walks the roof with the layout in hand before any racking is carried up.

Ruairi has the crew off the roof when the wind picks up, and back the next working day.

The picture is a still of the tools, not a portrait.

Two black steel angle brackets and a short black rail offcut on a folded canvas cloth on a roof membrane.AI-generated illustration. Not a real home or business.

Yusuf Kristiansen-Bell

Canopy crew lead

Puts up the raised canopies over flat roofs.

Yusuf sets each of the canopy's feet where the drawings put it, and checks it against the plan.

Yusuf leaves the walkway under the canopy as clear as the day he arrived.

The picture is a still of the tools, not a portrait.

All six of them

Where we stop

What you won't read on this site

Solar sites in the city are full of claims nobody selling panels could back. Each of these pages quotes one of them in a frame, says why this site leaves it out, and links the rule behind it.

Everything we will not claim

This is a demonstration website. Woodside Copewick Solar, LLC is a fictional solar installer and has no connection with any real installer in Woodside, in Queens or anywhere else; "Woodside" is the house name of a set of demonstration companies. Its people, its jobs and its customers are invented, it holds no license, registration, certification or insurance of any kind, no one will call or come, and nothing sent here will be charged. Every picture on the site was generated. It was built to show what a solar installer's own website and enquiry system can look like; the roof sizing planner and the enquiry form genuinely work, against a database, on this subdomain.

Size your roof

Try the roof sizing planner: panels, kilowatts and the roof they take at the published rate, in about three minutes. Sending it to us books nothing.