Solar in a Queens historic district
What the Landmarks Preservation Commission looks for, why the panels are all black and set back, and how much time the permit adds.
AI-generated illustration. Not a real home or business.
The commission comes first
Solar on a landmark or in a historic district needs a permit from the Landmarks Preservation Commission before the Buildings filing. Panels usually have to be all black and nearly invisible from the street, and the review adds weeks. We don't plan these online; we see them first.
The planner asks about it on its second step, "Is the house a landmark, or in a historic district?", and names some of the districts in the line beneath: Queens has historic districts in Sunnyside Gardens, Jackson Heights, Hunters Point and parts of Ridgewood, among others. If the answer is yes, the planner stops there and the house is looked at in person.
What the commission looks for
Its rules spell out when its own staff can approve panels:
- 63 RCNY § 2-21(g)(3) (opens the source in a new tab) The Landmarks Preservation Commission's staff may approve solar panels on a landmark or in a historic district when they are minimally visible, mounted close to a sloped roof and black with black framing.
In practice that means panels that are hard to see from the street. On a flat roof behind a parapet it usually means low frames set back from the front edge, so the parapet hides them from the sidewalk; on a sloped roof it means panels lying close to the slope rather than tilted up from it. A canopy, which stands above the parapet, is harder to keep out of sight than low frames.
And black, with no silver edge to catch the light. This company's panels are black-framed on every roof in any case:
Black-framed monocrystalline panels and either microinverters or a string inverter with optimizers, chosen at the survey for the roof. No maker is named on this site; the contract names the make and model of each.
The wiring is part of what the street sees, too, and it stays at the back:
The wiring
Under the panels, then in conduit down the back of the house to the meter and the panel in the basement, with a shut-off and the warning labels the code requires.
Which houses are the hard ones
A brick row house with a flat roof behind a solid parapet is usually the easier case: the panels sit below the line of the wall, and from the sidewalk across the street there is often nothing to see. A rear slope that faces a back yard is easier still. The hard case is a frame house whose sloped roof faces the street, because the slope is in plain view, and panels lying flat against it are still panels.
Corner houses are harder than the middle of a row, because they are seen from two streets, and so is a house whose neighbors are lower than it is. None of this decides an application on its own, but it decides how much care the drawings need, and sometimes whether panels on the front of the house should be asked for at all.
Esme Matsuda-Hale draws the first panel layouts and puts the filings together. She marks every vent, skylight and hatch on the layout before a single panel goes on it. On a house in a district the same drawing also has to show how high each panel stands above the roof and the line of sight over the parapet, because how much shows from the street is what the review is about.
The roofing itself
Some older houses in the districts still carry the roofing they were built with, and there the question changes:
Slate, clay tile and wood shakes crack under foot and under racking, and on an older house they are often the very roofing the landmarks rules protect. We don't plan panels on them.
If you are not sure
Plenty of owners do not know whether their house is inside a district. Answering that you are not sure is not a dead end:
You weren't sure whether the house is in a historic district. The office looks it up on the Landmarks Preservation Commission's map before the survey; if it is, the commission's permit comes first.
The time it adds
The commission's review is one more step before the Buildings filing can start, and it adds to the timeline:
From a signed contract to a system the utility lets you switch on usually takes two to four months in New York City: the drawings and the permits, the install itself in a day or two, the inspections, and the utility's own review. A landmark review or a fire department variance adds weeks.
No date is promised for the review, because the review is not the installer's to promise. What an installer can do is put complete papers in front of the commission the first time, with the drawings showing exactly where the panels sit and how much of them shows from the street.