How it works
The site survey: the roof measured, the basement seen
What is looked at on the roof and in the basement, how to get ready for it, and why nothing is designed or priced until it is done.
AI-generated illustration. Not a real home or business.
What the survey is for
Every job starts with a site survey: on the roof we measure it, the parapet, the bulkhead or hatch and everything that stands on it, check the covering and the shade, and in the basement we look at the electrical panel and the meter. It takes about an hour up there and a little longer with you. A survey costs nothing, and you don't have to sign anything after it.
Noemi Castellano-Reyes runs the company and does most of the site surveys. She measures every roof herself, from the parapet in, because a drawing is only as good as the tape. She sits down with you after the survey and goes through the layout before anything is written up.
Before the survey
Have a way up to the roof ready: the bulkhead door unlocked, or the hatch and its ladder clear.
Clear the way to the electrical panel and the meter in the basement.
Have a recent electricity bill to hand, or a year of them, so we can see your real use.
Tell us roughly when the house was built and when the roof was last replaced, if you know.
Think about where you would like the panels, and whether you use the roof yourself.
On the roof
A roof is read the way the layout will be drawn: from the edges in, then everything that stands on it, then what it is covered with.
The parapet and its coping
How high it stands and what shape it is in. The measurements start at the coping and work in, because the clear paths begin at the edges, and a layout that is out at the edge is out everywhere.
The bulkhead or the hatch
It is how the crew and every panel get up, and it is one of the fixed points the clear paths are drawn around. Whether its door closes properly and its ladder is sound is part of the look.
Everything that stands on the roof
Vent stacks, skylights, the chimney, an old antenna mount, the drain. Each is measured where it really is, because each is something a frame, a rail or a canopy foot has to go around.
The covering
What it is, how many layers there are, and what shape it is in: blisters, open seams, soft spots underfoot, water standing after rain. A covering near the end of its life is replaced first, by a roofer.
The shade
Where it falls and from what: a street tree, a taller building, the neighbor's bulkhead, a water tank on the next block.
On a sloped roof, the faces and the rafters
Which way each face points, how steep it is, and where the rafters run under the shingles, because every attachment is fixed into one.
In the basement
The electrical panel
Breakers or fuses, the size of the service the house has, and whether the panel has room for the solar circuit. An old fuse box is not a reason to stop; it is a reason to look properly.
The meter
Where it is on the wall, and the route a conduit can take from the roof down the back of the house to reach it.
An old fuse box, or an electrical service nobody has looked at, is checked at the survey before the system is designed: some houses need a new service or a main panel first, which a licensed master electrician does and is priced in writing.
The structure, and an older house
Every roof is checked for the load: the engineer or architect who files the job works out what the rafters or the roof deck carry, and what holds the racking down in a storm, before anything is ordered.
For a house built before 1987, or one whose age nobody knows, the owner has an asbestos investigation made before the Buildings filing, because old roofing and the materials around it can contain asbestos. It is a step on the way, not a reason to stop.
What comes after it
After the survey you get a written contract: the system's size, the make and model of the panels and the inverters, the layout, the price itemized, the dates we expect to start and finish, the payment stages, what the system is expected to make with the losses worked out, the production guarantee, the makers' warranties, and who is responsible for the roof where it is fixed. New York names solar energy systems in its home improvement law, so a job over five hundred dollars needs one in writing, signed by both of us, with a copy for you before any work is done.
Size it first, if you like
Try the roof sizing planner: panels, kilowatts and the roof they take at the published rate, in about three minutes. Sending it to us books nothing.